• PRODUCTS

    HONGWANG STEEL CO., LTD is a leading professional comprehensive steel company

    with collection of producing, processing, distributing and trading.

Factory Supply brass pipe CW352H C71500 C17200 C70600 C93200 Copper Tube

Factory Supply brass pipe CW352H C71500 C17200 C70600 C93200 Copper Tube
Material:C12300,C1020P,C10100,C10400,C10700,C10200,T2,C1100P,C10500,M1,Cu-ETP,TP1,C1201P,C11000,Cu-DLP,TP2,C1220P,C1221P,C1200,C12200,C14200,C23000P,H62,C2801P,C36500,
Standard: JIS H3100-2006 ,ASTM B152M-06,GB/T 2040-2008,ROCT 495-92,EN 1652-98,ASTM B171M-04,
Lead Time: Stock or 3-10 days or according to quantity
Trade Term: Telegraphic Transfer,T/T,Letter of Credit,L/C
Phone: 86 18761518646
WhatsApp: +86 18761518646
Email:Jada@hongwangss.com
Requeat A Quote
DETAILS

TypeStraight Copper Pipe
ApplicationWater Heater
SpecificationCustomized
GradeC1020/C1100/C1200/C1220/TU1/TU2/T2
LengthCustomized
Cu (Min)99.9%
Alloy Or NotNon-Alloy
Ultimate Strength (≥ MPa)205
Elongation (≥ %)45%(B30)
Wall Thickness0.2-120mm
Outside Diameter2-910mm
Model NumberH96 C10100 C10200
Place of OriginChina
Processing ServiceBending, Decoiling, Welding, Punching, Cutting
VIDEO
PACKAGE
DETECT
CERTIFICATE
  • HONGWANG-ISO
FAQ

Q: Will the Test Certificate meet EN10204 3.1/3.2?

A: We will provide Original Mill Test Certificate certified to EN10204 3.1/3.2 for products in stock or further processing needed.

 

Q: Once the products received by customer were found not comply with the products or contract demands, what will you do?

A: We will compensate the customer for all the loss without any hesitation.

 

Q: How long is your delivery time?

A: Generally it is 2-5 days if the goods are in stock or it will need 7-20 days if the goods need to be customized.

 

Q: Do you provide samples Is it free or extra?

A: Yes, we could offer free samples.

 

Q: What is your terms of payment?

A: 20% Prepayment and balance see B/L copy or 100%LC at sight.

ONLINE MESSAGE

Submit

MORE RECOMMENDATIONS